Rose Valley Reservoir – Source Water Improvements

Share Rose Valley Reservoir – Source Water Improvements on Facebook Share Rose Valley Reservoir – Source Water Improvements on Twitter Share Rose Valley Reservoir – Source Water Improvements on Linkedin Email Rose Valley Reservoir – Source Water Improvements link

Project Background

On November 26, 2024, West Kelowna City Council approved $2.5 million in funding to improve the source water quality at the Rose Valley Reservoir. Since the City assumed management of the water system in 2011, the reservoir has experienced increasing water quality challenges. The improvements aim to address key concerns such as manganese levels, algae growth, and other source water quality issues.

The upgrade project includes:

  • Installation of a potassium permanganate treatment system
  • Intake improvements
  • Aeration system enhancements

The top priority is the potassium permanganate dosing system, which is essential for managing rising manganese levels expected during the summer months.


Potassium Permanganate Dosing System

The City is currently reviewing supplier submissions received through a Request for Quotations process for potassium permanganate systems and chemical pump skids. These systems will:

  • Control chemical concentrations
  • Ensure consistent flow rates
  • Dose potassium permanganate into the water intake pipe leading to the treatment plant

Installation and Commissioning Timeline:

  • Equipment arrival: June 2025
  • Installation and integration: By City staff and electrical contractor Centrix
  • Integration: With Rose Valley Water Treatment Plant’s communications systems

A manganese analyzer has already been installed and is actively sending real-time data to City operations staff. Should manganese levels rise before the new system is in place, chlorine will be used at the plant to oxidize manganese and enable its removal during treatment.


Aeration System Improvements

To further enhance water quality, the City, in collaboration with AECOM and Larratt Aquatic, is working on the design of a new aeration system for the reservoir. These improvements are targeted to:

  • Reduce algae blooms
  • Lower dissolved manganese
  • Improve taste and odour of drinking water

Timeline:

  • Design Completion: 2025
  • Installation: Spring 2026

In the meantime, the existing aerator has been upgraded, increasing air flow and improving oxygen levels in the reservoir. Early monitoring indicates a larger zone of influence and better water quality. These interim improvements will continue to be monitored over the summer.

Power requirements for the new system have been confirmed by BC Hydro. The system is being designed to operate within the current power availability, with future scalability planned through the addition of three-phase power.

Project Risk Assessment

Risk is being actively managed through a Risk Log, maintained collaboratively by City staff and the project team. The log is regularly updated to identify and mitigate any potential project risks throughout all phases of design, procurement, and installation.

Project Background

On November 26, 2024, West Kelowna City Council approved $2.5 million in funding to improve the source water quality at the Rose Valley Reservoir. Since the City assumed management of the water system in 2011, the reservoir has experienced increasing water quality challenges. The improvements aim to address key concerns such as manganese levels, algae growth, and other source water quality issues.

The upgrade project includes:

  • Installation of a potassium permanganate treatment system
  • Intake improvements
  • Aeration system enhancements

The top priority is the potassium permanganate dosing system, which is essential for managing rising manganese levels expected during the summer months.


Potassium Permanganate Dosing System

The City is currently reviewing supplier submissions received through a Request for Quotations process for potassium permanganate systems and chemical pump skids. These systems will:

  • Control chemical concentrations
  • Ensure consistent flow rates
  • Dose potassium permanganate into the water intake pipe leading to the treatment plant

Installation and Commissioning Timeline:

  • Equipment arrival: June 2025
  • Installation and integration: By City staff and electrical contractor Centrix
  • Integration: With Rose Valley Water Treatment Plant’s communications systems

A manganese analyzer has already been installed and is actively sending real-time data to City operations staff. Should manganese levels rise before the new system is in place, chlorine will be used at the plant to oxidize manganese and enable its removal during treatment.


Aeration System Improvements

To further enhance water quality, the City, in collaboration with AECOM and Larratt Aquatic, is working on the design of a new aeration system for the reservoir. These improvements are targeted to:

  • Reduce algae blooms
  • Lower dissolved manganese
  • Improve taste and odour of drinking water

Timeline:

  • Design Completion: 2025
  • Installation: Spring 2026

In the meantime, the existing aerator has been upgraded, increasing air flow and improving oxygen levels in the reservoir. Early monitoring indicates a larger zone of influence and better water quality. These interim improvements will continue to be monitored over the summer.

Power requirements for the new system have been confirmed by BC Hydro. The system is being designed to operate within the current power availability, with future scalability planned through the addition of three-phase power.

Project Risk Assessment

Risk is being actively managed through a Risk Log, maintained collaboratively by City staff and the project team. The log is regularly updated to identify and mitigate any potential project risks throughout all phases of design, procurement, and installation.

  • Council Highlights - May 20, 2025

    Share Council Highlights - May 20, 2025 on Facebook Share Council Highlights - May 20, 2025 on Twitter Share Council Highlights - May 20, 2025 on Linkedin Email Council Highlights - May 20, 2025 link
    supporting image

    Quarterly update provided on Rose Valley Source Water Improvements

    Staff provided a quarterly update on Rose Valley Source Water Improvements, which will include a potassium permanganate system that will be completed this summer to address manganese in the reservoir. Staff also noted that an existing aeration system in the reservoir has been refurbished to help address manganese and algae this year until the new aeration system is installed in 2026. See the presentation via the May 20 webcast. The next monthly community update will go out next week.

  • Council Highlights - November 26, 2024

    Share Council Highlights - November 26, 2024 on Facebook Share Council Highlights - November 26, 2024 on Twitter Share Council Highlights - November 26, 2024 on Linkedin Email Council Highlights - November 26, 2024 link
    supporting image

    Presentation provided on Rose Valley Reservoir
    Larratt Aquatic Consulting provided a presentation on Rose Valley Reservoir, the source water for the Rose Valley Water Service Area, including a brief history, its challenges and opportunities in providing safe drinking water to approximately half the City. While the challenges of the 2023 McDougall Creek Wildfire have yet to be fully realized and may not be for a further four or five years, the City is working with water experts, including Larratt, to provide solutions for the source water.


    Rose Valley Reservoir source water improvements approved
    Following a presentation on Rose Valley Reservoir source water challenges, including the effects of manganese, Council directed staff to amend the 2024 Budget to reallocate $2.5 million from Rose Valley Water Reserves for source water improvements in the reservoir. The improvements will include advance aeration and oxidation systems to be completed in 2025. Staff also continues ongoing monitoring of the reservoir, anticipates that the next increase in manganese levels will occur as early as March, and will be prepared to restart the temporary advance oxidation system to help manage any spikes. Staff will also be adding water quality test results, from 2024 onward, to the City’s website, to help improve transparency to the public across all water operations.

  • Project updates

    Share Project updates on Facebook Share Project updates on Twitter Share Project updates on Linkedin Email Project updates link
    supporting image

    Stay tuned for updates throughout the project!

Page published: 22 May 2025, 01:59 PM